Quality Assurance Checklist

Order Number  
Date:   Model:  
Built By:   Serial Number:  
Comments:  


Operation

Running Direction as seen from Impeller.
Operational Rotation         Return to Production
Condition    New Unit   Rebuilt

Electrical Measured Inspection

Running Voltage and Current Inspection
Operating Voltage
While Running
Operating Voltage
before start
Running current
(impeller installed)
Temperature at impeller
shaft after 5 minute

Visual Inspection

Overall Appearance
- Impeller and Screen – installed YES     N/A
- Unit Clean and Solid YES     Not Exceptable
- Grinding Ring installed YES     N/A
- Belts Adjustment – Full Tension YES     Adjusted
- Base – Aligned with Cyclone Body YES     NO (Return to Production)
- Label On Front Of Mill Base YES     NO (Return to Production)
- Label On Back Of Mill Chamber YES     NO (Return to Production)
- Base Plate Installed YES     NO (not required)
- Air Septerator Installed YES     NO (Return to Production)
- on / off switch (straight) YES     NO (Return to Production)

Auditable Inspection

Reject for abnormality
- Rattle None Unit tight     Return to Production
- Vibration Passed (Normal)     NO Failed ( Return to Production )
- Safety Switch Operable (both conditions On/Off) YES Normal     NO Failed ( Return to Production )
- Normal Start YES Normal     NO Failed ( Return to Production)

Packaging

Accessories Included and Properly Boxed
- Inner Box Includes Paperwork Checked - OK
- Outer box includes shipping docs. Checked - OK
- Mill box Includes Standard Accessories. YES (Checked Against Invoice)
- Ship to address correct YES (Checked Against Invoice)
  Inspected By: